Home / Why Medhurst / Customer Stories / Example Principal Contractor
Capital Programmes

One fixed-price ICT sub-contract on an SRP build

How a principal contractor de-risked the ICT scope on a School Rebuilding Programme scheme with a single accountable sub-contract.

Illustrative placeholder case study. Real customer name, quotes, and figures are added with consent (N-018).
1
ICT sub-contract
fixed price
Day one
operational ICT
at occupation
SRP
scheme
delivered end to end
Gold
Constructionline
compliant delivery
Client profile

A principal contractor carrying programme risk

Example Principal Contractor was delivering a School Rebuilding Programme scheme and needed the ICT scope handled without adding interface risk to an already complex build.

The challenge

ICT scope as a risk

Coordinating multiple ICT specialists across cabling, networking, AV, and security risked scope gaps at the interfaces and disputes at final account.

“Unmanaged ICT scope is a risk we do not need on a build like this.”
A. Example, Commercial Director, Example Principal Contractor
Illustrative placeholder · pending consent
Kaizen: Scope, Design, Deliver, Refresh

The solution

One sub-contract

The full ICT package taken as a single fixed-price sub-contract, owned end to end.

Bid-stage clarity

A costed scope with clear assumptions and exclusions from bid stage.

Compliance produced as we go

Spec 21 and Spec 25 evidence, SS5 summaries, and ISO 19650-aligned information.

Operational on day one

ICT commissioned and working when the school took occupation.

The results

What changed

  • One accountable supplier for all ICT
  • No scope gaps at the interfaces
  • Spec compliance evidenced throughout
  • Operational ICT on day one of occupation
One scope, one price, one supplier to call. That is what took the risk out.A. Example, Commercial Director (illustrative)
Project phasing

How it ran

Initial

Bid-stage scope

Costed ICT scope with assumptions and exclusions.

Contracted

Fixed price

Scope and price locked, lead times managed.

Detailed

Design and submissions

Stage 4 design and structured compliance submissions.

Complete

Handover

Commissioned, compliant, operational on day one.